Location
Fort Worth, TX
Property
Distribution warehouse
Roof area
38,000 sq ft
Material
Standing-seam metal
Duration
5 weeks
Completed
February 2026
The brief
A leaking roof over a warehouse that could not close.
An aging metal roof was letting water into the packing area during every heavy storm. The client needed a long-term fix without slowing down shipping.
Rusted fasteners, failed seams above the packing hall, and no room for a shutdown during peak season.
Job sheet
Property
Distribution warehouse
Crew
Commercial crew · 12 roofers
Roof area
38,000 sq ft
Completed
February 2026
Warranty
20-year system
What we found
The inspection, in plain words.
Every finding came with photos and a clear rating, so the owners knew what had to be done now and what could wait.
Finding 01
Replace
Failed seams over the packing hall
Open laps and rusted fasteners were letting water onto the packing lines during every heavy storm.
Finding 02
Repair
Gutters and downspouts undersized
Overflowing gutters were pushing water back under the panel edges along the loading side.
Finding 03
Watch
Skylight curbs near end of life
Still sound for now. Added to the maintenance plan for a check after each storm season.
Replace: worn out across the area · Repair: one fault letting water in · Watch: fine for now, checked again next year
Scope of work
What the price covered.
Moisture survey and leak map of the full roof
Standing-seam panels installed in overnight sections
New insulation over the packing hall
Larger gutters and downspouts on the loading side
Two-year maintenance plan with post-storm checks
Project investment
$448,000
Fixed price across five phases, each signed off before the next began.
Changed on site
One extra night shift to stay ahead of a storm front, covered under the original price.
Build log
Day by day on site.
We mapped every leak with a moisture survey, then replaced the roof in overnight sections. Each section was sealed and water-tested before the morning shift arrived.
01
Week 1
Survey and staging
Moisture survey, leak map and a phase plan agreed with the warehouse manager.
02
Weeks 2–3
Packing hall section
Worst area first, replaced overnight so the shipping floor stayed open by day.
03
Week 4
Remaining roof and gutters
The rest of the roof in sections, with new gutters along the loading docks.
04
Week 5
Final inspection and handover
Water test, punch list closed and the maintenance schedule handed to the facilities team.
The result
How it turned out.
No shipping days lost, no leaks through the following storm season, and a maintenance plan the facilities team can budget around.

Finished
February 2026
We never lost a shipping day. They worked nights, kept the floor dry and sent a progress report every morning.
Facilities manager, Fort Worth


0 days
Of shipping lost during the five-week build
38,000
Square feet re-roofed in overnight sections
20 yr
Manufacturer system warranty on the new roof